About the project
The bathroom work included marble-effect cladding, an L-shaped bath and shower screen, a mixer shower, toilet and basin. The floor was levelled with 5 mm ply before LVT was laid. The photographs show the room during the strip-out and refitting stages. The same update also mentions extra wardrobe shelves and hanging space.
Project photographs








